• 0

Project Consultancy, Reports & Profiles


We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

Sort by :
Sterile Disposable Plastic Syringes Manufacturing
Sterile Disposable Plastic Syringes Manufacturing

Disposable Syringes are made from plastic material and are utilized in th... Read More

Capacity :
Disposable Plastic Syringes 3 ml Size: 1,440 Boxes / Day (Each Box = 100 Pcs) Disposable Plastic Syr
Plant and Machinery cost:
340.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
18.00%
Break Even Point (BEP):
62.00 %
TCI :
0.00 Lakhs
Cost of Project :
772.00Lakhs
Add To Inquiry Basket
Setup a Lucrative Business of Solar Panel Renewable Energy is the Fastest-Growing Industry in the World
Setup a Lucrative Business of Solar Panel Renewable Energy is the Fastest-Growing Industry in the World

 

A solar panel is ... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Business of Medical Disposables Gowns and Drapes
Business of Medical Disposables Gowns and Drapes

 

Surgical gowns mu... Read More

Capacity :
Medical Gowns: 1,250 Pcs per Day Medical Drapes: 1,250 Pcs per Day
Plant and Machinery cost:
209.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.54%
Break Even Point (BEP):
55.16 %
TCI :
0.00 Lakhs
Cost of Project :
529.00Lakhs
Add To Inquiry Basket
Start Investing in Most Growing Business of Medical Disposable Start Manufacturing Unit of Medical Disposables Gowns and Drapes
Start Investing in Most Growing Business of Medical Disposable Start Manufacturing Unit of Medical Disposables Gowns and Drapes


Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
1.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Opportunities in Business of Disposable Plastic Syringes
Opportunities in Business of Disposable Plastic Syringes

 

Disposable Syring... Read More

Capacity :
Disposable Plastic Syringes with Needles 1 ml Size each Packed in Polypack: 62,500 Nos Per Day Dis
Plant and Machinery cost:
441.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
34.00%
Break Even Point (BEP):
40.00 %
TCI :
0.00 Lakhs
Cost of Project :
2149.00Lakhs
Add To Inquiry Basket
Startup Opportunities in Active Pharma Ingredients
Startup Opportunities in Active Pharma Ingredients

 

Startup Opportunities in Active Pharma Ing... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Active Pharma Ingredients (API) Amoxicillin Trihydrate, Azithromycin & Paracetamol
Active Pharma Ingredients (API) Amoxicillin Trihydrate, Azithromycin & Paracetamol

Active pharmaceutical ingredients are the active substances that are used in the manufacture of a drug and have ... Read More

Capacity :
Paracetamol:1,000 Kgs / day Azithromycin:500 Kgs / day Amoxicillin Trihydrate:500 Kgs / day
Plant and Machinery cost:
175.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
1322.00Lakhs
Add To Inquiry Basket
Start a Disposable Plastic Syringes Manufacturing Business
Start a Disposable Plastic Syringes Manufacturing Business

Disposable Syringes are made from plastic material and are utilized in the sector of medical and veterinary science. because of their availability ... Read More

Capacity :
Disposable Plastic Syringes 1 ml Size: 720 Boxes / Day (Each Boxes = 100 Pcs) Disposable Plastic Sy
Plant and Machinery cost:
513.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
63.00 %
TCI :
0.00 Lakhs
Cost of Project :
1300.00Lakhs
Add To Inquiry Basket
Lithium Ion Battery (Battery Assembly)
Lithium Ion Battery (Battery Assembly)

Lithium ion batteries are those that can be recharged. Lithium batteries are now powering a wide range of electrical a... Read More

Capacity :
90 Volt, 180 AH Lithium Ion Battery Pack : 56 Nos./Day
Plant and Machinery cost:
503.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
31.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
1382.00Lakhs
Add To Inquiry Basket
Bio-Plastic Bags and Containers from Corn Starch
Bio-Plastic Bags and Containers from Corn Starch

Biodegradable plastics are mainly derived from corn, wheat and potato starch. Biodegradable plastics products are ther... Read More

Capacity :
Bio Plastic Bags (Per Bag 25 gms Size): 360,000 Kgs per annum Bio Plastic Containers (Per Containers
Plant and Machinery cost:
546.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
33.00%
Break Even Point (BEP):
38.00 %
TCI :
0.00 Lakhs
Cost of Project :
2546.00Lakhs
Add To Inquiry Basket
Biodegradable Disposable Plastic Cutlery
Biodegradable Disposable Plastic Cutlery

Biodegradable Disposable Plastic Cutlery. (Eco Friendly Compostable Spoons Cutlery) Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Oxygen and Nitrogen Gas Plant
Oxygen and Nitrogen Gas Plant

Oxygen (CO2,gas at O0/1 matm. 1.429 g./l, crit. pressure, 49.7 matm.) is a colorless, odourless, an... Read More

Capacity :
Oxygen Gas: 667,800 Cu.mtrs per annum Nitrogen Gas: 2,480,400 Cu.mtrs per annum
Plant and Machinery cost:
306.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
62.00 %
TCI :
0.00 Lakhs
Cost of Project :
643.00Lakhs
Add To Inquiry Basket
Fish Meal Manufacturing Business
Fish Meal Manufacturing Business

Fish Meal Manufacturing Business. Production of Powdered Fish Meal. Business Opportun... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Lithium Ion Battery (Battery Assembly)
Lithium Ion Battery (Battery Assembly)

Lithium batteries are now powering a wide range of electrical and electronical devices, including laptop computers, mo... Read More

Capacity :
90 Volt, 180 AH Lithium Ion Battery Pack: 16,800 Nos per Annum
Plant and Machinery cost:
504.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
31.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
1381.00Lakhs
Add To Inquiry Basket
Hybrid Electric Scooter Assembling
Hybrid Electric Scooter Assembling

A plug-in hybrid electric vehicle (PHEV) is an HEV that can be plugged-in or recharged from wall electricity. PHEVs ar... Read More

Capacity :
50 Nos./day
Plant and Machinery cost:
95.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
34.00%
Break Even Point (BEP):
74.00 %
TCI :
0.00 Lakhs
Cost of Project :
279.00Lakhs
Add To Inquiry Basket
Hybrid Electric Scooter Assembling Business
Hybrid Electric Scooter Assembling Business

Hybrid Electric Scooter Assembling Business. Electric Vehicles (EVs) Industry. Busine... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Fish Flavoured Chips
Fish Flavoured Chips

A snack is a small service of food and generally eaten between meals. Snacks come in a variety... Read More

Capacity :
1000 Kg/day
Plant and Machinery cost:
46.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
64.00 %
TCI :
0.00 Lakhs
Cost of Project :
252.00Lakhs
Add To Inquiry Basket
Lithium Ion Battery (Battery Assembly)
Lithium Ion Battery (Battery Assembly)

Lithium batteries are now powering a wide range of electrical and electronical devices, including laptop computers, mo... Read More

Capacity :
90 Volt, 180 AH Lithium Ion Battery Pack : 56 Nos/day
Plant and Machinery cost:
90.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
34.00%
Break Even Point (BEP):
55.00 %
TCI :
0.00 Lakhs
Cost of Project :
1076.00Lakhs
Add To Inquiry Basket
Fish Canning in Tins & Pouches
Fish Canning in Tins & Pouches

Canned fish are fish which have been processed, sealed in an airtight container such as a seal... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Disposable Plastic Syringes
Disposable Plastic Syringes

Disposable Syringes are made of plastic material and are used in the field of medical and veterinary science. Due to t... Read More

Capacity :
460 Boxes/Day
Plant and Machinery cost:
115.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
18.00%
Break Even Point (BEP):
67.00 %
TCI :
0.00 Lakhs
Cost of Project :
289.00Lakhs
Add To Inquiry Basket
E-Rickshaw
E-Rickshaw

Electric Rickshaw, in short, also called as E-Rickshaw. This kind of transport vehicle are famous in many countries, t... Read More

Capacity :
1,200 Nos per Annum
Plant and Machinery cost:
29.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
24.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
324.00Lakhs
Add To Inquiry Basket
E-Rickshaw (Electric tuk-tuks) Manufacturing Business
E-Rickshaw (Electric tuk-tuks) Manufacturing Business

E-Rickshaw (Electric tuk-tuks) Manufacturing Business. How to Start Electric Vehicle ... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Disposable Plastic Syringes
Disposable Plastic Syringes

Disposable Syringes are made of plastic material and are used in the field of medical and veterinary science. Due to their availability in steriliz... Read More

Capacity :
Disposable Plastic Syringes 2 ml Size : 350 Boxes/day Disposable Plastic Syringes 5 ml Size : 350 Bo
Plant and Machinery cost:
151.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
63.00 %
TCI :
0.00 Lakhs
Cost of Project :
343.00Lakhs
Add To Inquiry Basket
Disposable Plastic Syringes
Disposable Plastic Syringes

Disposable Syringes made of plastic ... Read More

Capacity :
Disposable Plastic Syringes (2 ml Size):40000 Pcs/Day•Disposable Plastic Syringes (5 ml Size):40000
Plant and Machinery cost:
490.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
15.24%
Break Even Point (BEP):
61.07 %
TCI :
757.00 Lakhs
Cost of Project :
757.00Lakhs
Add To Inquiry Basket
Biodegradable Disposable Cups and Plates using Sugarcane Bagasse
Biodegradable Disposable Cups and Plates using Sugarcane Bagasse

Agricultural wastes constitute one of the main alternative raw materials for the pulp and paper industry. Wheat straw, bagasse, reed, and rice stra... Read More

Capacity :
Disposable Paper Cups :7.5 MT/Day Disposable Paper Plates:7.5 MT/Day
Plant and Machinery cost:
32.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.18%
Break Even Point (BEP):
56.37 %
TCI :
314.00 Lakhs
Cost of Project :
314.00Lakhs
Add To Inquiry Basket
SOLAR PANEL
SOLAR PANEL

Solar Panels are in general Silicon ... Read More

Capacity :
Solar PV Module (240 watt) : 350 Nos/day (25 MW)
Plant and Machinery cost:
278.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
58.00 %
TCI :
852.00 Lakhs
Cost of Project :
852.00Lakhs
Add To Inquiry Basket
Packaged Drinking Water
Packaged Drinking Water
As the name implies, the mineral water is the purified water fortified with requisite amounts of minerals. It is either obtained from natural resource... Read More
Capacity :
3000000 Ltrs. /Annum
Plant and Machinery cost:
24.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
24.00%
Break Even Point (BEP):
62.00 %
TCI :
112.00 Lakhs
Cost of Project :
112.00Lakhs
Add To Inquiry Basket
PAPER NAPKINS, FACIAL TISSUE, TOILET ROLLS, KITCHEN ROLL & HANDKERCHIEF
PAPER NAPKINS, FACIAL TISSUE, TOILET ROLLS, KITCHEN ROLL & HANDKERCHIEF

Paper is one of the necessities of civilization and it is almost impossible to imagine the continuance of a world without the printed books and new... Read More

Capacity :
Plant and Machinery cost:
88.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
32.00%
Break Even Point (BEP):
39.00 %
TCI :
595.00 Lakhs
Cost of Project :
595.00Lakhs
Add To Inquiry Basket
Packaged Drinking Water With PET Bottles
Packaged Drinking Water With PET Bottles
Water is the necessity of our daily life, it’s so important for us that we need clean, safe and sanitary water every day, and usually there’s a mo... Read More
Capacity :
40000 Ltrs./Day
Plant and Machinery cost:
59.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
63.00 %
TCI :
171.00 Lakhs
Cost of Project :
171.00Lakhs
Add To Inquiry Basket
BIO PLASTIC PRODUCTS
BIO PLASTIC PRODUCTS

Plastics have become an important part of modern life and are used in different sectors of applications like packaging, building materials, consume... Read More

Capacity :
Plant and Machinery cost:
166.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
47.00%
Break Even Point (BEP):
51.00 %
TCI :
298.00 Lakhs
Cost of Project :
298.00Lakhs
Add To Inquiry Basket
PACKAGED DRINKING WATER
PACKAGED DRINKING WATER

Bottled Water means water intended for human consumption and which is sealed in bottles and other containers with no added ingredients except that ... Read More

Capacity :
3000000 Bottles/Annum
Plant and Machinery cost:
39.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
41.00%
Break Even Point (BEP):
52.00 %
TCI :
108.00 Lakhs
Cost of Project :
108.00Lakhs
Add To Inquiry Basket
DISPOSABLE SYRINGES
DISPOSABLE SYRINGES

Disposable needle is widely used by ... Read More

Capacity :
Disposable Plastic Syringes 2 ml Size : 300,000 Boxes/Annum Disposable Plastic Syringes 5 ml Size :
Plant and Machinery cost:
636.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
46.00%
Break Even Point (BEP):
42.00 %
TCI :
837.00 Lakhs
Cost of Project :
837.00Lakhs
Add To Inquiry Basket
PACKAGED DRINKING WATER
PACKAGED DRINKING WATER

Bottled Water means water intended for human consumption and which is sealed in bottles and other containers with no added ingredients except that ... Read More

Capacity :
0
Plant and Machinery cost:
25.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
44.00%
Break Even Point (BEP):
54.00 %
TCI :
100.00 Lakhs
Cost of Project :
100.00Lakhs
Add To Inquiry Basket
WOODEN FURNITURE
WOODEN FURNITURE

Wooden furniture is used for articles of daily use in dwelling house, place of business, public buildings and includes items such as chairs, tables... Read More

Capacity :
7500 Pcs./Annum
Plant and Machinery cost:
13.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
46.00%
Break Even Point (BEP):
38.00 %
TCI :
118.00 Lakhs
Cost of Project :
118.00Lakhs
Add To Inquiry Basket
PAPER NAPKINS, TOILET ROLL & FACIAL PAPER FROM TISSUE PAPER ROLLS
PAPER NAPKINS, TOILET ROLL & FACIAL PAPER FROM TISSUE PAPER ROLLS

Hygiene is an essential component of healthy living, integral to achieving health and preventing disease. Not just selecting the right food choices... Read More

Capacity :
3000 MT/Annum, 6 MT Paper Napkins, 2 MT Toilet Rolls, 2 MT Facial Paper
Plant and Machinery cost:
41.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
49.00%
Break Even Point (BEP):
25.00 %
TCI :
923.00 Lakhs
Cost of Project :
923.00Lakhs
Add To Inquiry Basket
COTTON SEED DELINTING, CRUSHING AND REFINING OF OIL
COTTON SEED DELINTING, CRUSHING AND REFINING OF OIL

Cotton plant is cultivated mainly for fibre. Cottonseed is an important by- product of cotton which is a rich source of protein and edible oil. Its... Read More

Capacity :
18000 MT/Annum (Refined Cotton Seed Oil)
Plant and Machinery cost:
700.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
42.00%
Break Even Point (BEP):
70.00 %
TCI :
1671.00 Lakhs
Cost of Project :
1671.00Lakhs
Add To Inquiry Basket
Refined Vegetable Oil
Refined Vegetable Oil

Refined vegetable oil is considered to be high quality edible oil because of its non-cholesterol properties. Its main use in the world is in cookin... Read More

Capacity :
75 MT / Day
Plant and Machinery cost:
141.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
55.00%
Break Even Point (BEP):
22.00 %
TCI :
3395.00 Lakhs
Cost of Project :
3395.00Lakhs
Add To Inquiry Basket
CURCUMIN
CURCUMIN

Turmeric is native to Asia and India. It is very important spice in India, which produces nearly the whole worlds crop and used 80% of it. It has b... Read More

Capacity :
40 Kgs. Curcumin / Day, 40 Kgs. Oil
Plant and Machinery cost:
105.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
43.00%
Break Even Point (BEP):
40.00 %
TCI :
400.00 Lakhs
Cost of Project :
400.00Lakhs
Add To Inquiry Basket
GINGER PRODUCTS (Ginger Paste, Powder & Oil)
GINGER PRODUCTS (Ginger Paste, Powder & Oil)

Ginger is the most important and one of the oldest spices used in every kinds of food preparation. It is one of the agro-based products, which has ... Read More

Capacity :
600 MT /Annum Ginger Paste,75 MT / Annum Ginger Powder,6000 Ltrs. / Annum Ginger Oil
Plant and Machinery cost:
85.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
42.00%
Break Even Point (BEP):
63.00 %
TCI :
232.00 Lakhs
Cost of Project :
232.00Lakhs
Add To Inquiry Basket
EXTRACTION OF SPICE OLEORESIN (Chilly)
EXTRACTION OF SPICE OLEORESIN (Chilly)

Chilly is available in throughout India. It is one of the abundantly domestically used as well as commercially used spices. For extraction of chill... Read More

Capacity :
Chilly Oleoresin "9 MT / Annum, Chilly Oil" 2.16 MT / Annum, Ground Chill Powder  "58.50 MT / Ann
Plant and Machinery cost:
137.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
38.00%
Break Even Point (BEP):
46.00 %
TCI :
274.00 Lakhs
Cost of Project :
274.00Lakhs
Add To Inquiry Basket
Rickshaw Cycle Tyre & Tubes
Rickshaw Cycle Tyre & Tubes

Rickshaw/Cycle Tyre & Tubes

Bicycle and rickshaw tyres & tubes are the bac... Read More

Capacity :
Rickshaw & Cycle Tyres : 1,500.00 Nos./Day,Rickshaw & Cycle Tubes: 1,500.00 Nos./Day
Plant and Machinery cost:
128.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
72.00 %
TCI :
570.00 Lakhs
Cost of Project :
570.00Lakhs
Add To Inquiry Basket
Packaged Drinking Water & Pet Bottle
Packaged Drinking Water & Pet Bottle

-

Read More
Capacity :
7000 Ltrs Packaged Drinking/day, 7000 Nos. Pet Bottles/day
Plant and Machinery cost:
60.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
42.00%
Break Even Point (BEP):
48.00 %
TCI :
135.00 Lakhs
Cost of Project :
135.00Lakhs
Add To Inquiry Basket
Pharmaceutical Tablets, Capsules, Liquid Oral, Ointment, Powder and Injection
Pharmaceutical Tablets, Capsules, Liquid Oral, Ointment, Powder and Injection

The Pharmaceutical Industry in general is well managed in sound economic principles and has excellent techniques of production, technological backi... Read More

Capacity :
0
Plant and Machinery cost:
43.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
43.00%
Break Even Point (BEP):
54.00 %
TCI :
125.00 Lakhs
Cost of Project :
125.00Lakhs
Add To Inquiry Basket
WOODEN DOORS AND FRAMES
WOODEN DOORS AND FRAMES

Carpentry and joinery are common terms used with any class of work with wood. Strictly speaking carpentry deals with all works of a carpentry such ... Read More

Capacity :
80 Pcs./day
Plant and Machinery cost:
10.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
50.00%
Break Even Point (BEP):
42.00 %
TCI :
93.00 Lakhs
Cost of Project :
93.00Lakhs
Add To Inquiry Basket
TRANSFORMER OIL
TRANSFORMER OIL

Transformer oils are mainly mineral oils and are used to dissipate the heat generated in electric transformers, switches, circuit breakers, and mot... Read More

Capacity :
100 K Ltrs./day
Plant and Machinery cost:
1104.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
45.00%
Break Even Point (BEP):
30.00 %
TCI :
3030.00 Lakhs
Cost of Project :
3030.00Lakhs
Add To Inquiry Basket
Aluminium Foil
Aluminium Foil

-

Read More
Capacity :
10 MT/Day
Plant and Machinery cost:
200.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
47.00%
Break Even Point (BEP):
36.00 %
TCI :
1300.00 Lakhs
Cost of Project :
1300.00Lakhs
Add To Inquiry Basket
Extraction and Refining of Castor Oil
Extraction and Refining of Castor Oil

India is one of the best producers of castor seed. It has very good commercial importance. Above all it content oil, carbohydrate protein, fibre an... Read More

Capacity :
10 MT/day
Plant and Machinery cost:
149.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
43.00%
Break Even Point (BEP):
38.00 %
TCI :
545.00 Lakhs
Cost of Project :
545.00Lakhs
Add To Inquiry Basket
MOSQUITO REPELLENT COILS
MOSQUITO REPELLENT COILS

The production of the mosquito coils dates back from the period around 1890. In the early stages the look and the shapes of an incense stick burned... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
FISH FARMING
FISH FARMING

A larger part of the average family's food bill goes on protein foods e.g. cheese, eggs and fish etc., which are important parts of a healthy and w... Read More

Capacity :
4 Ton/Day
Plant and Machinery cost:
90.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
53.00%
Break Even Point (BEP):
31.00 %
TCI :
500.00 Lakhs
Cost of Project :
500.00Lakhs
Add To Inquiry Basket
ROSE PLANTATION AND ROSE OIL EXTRACTION
ROSE PLANTATION AND ROSE OIL EXTRACTION

There are more than 5000 verities of rose in India of which only a few yield essential oils. The verities that are grown in India for obtaining ess... Read More

Capacity :
Flower Yield 4000 Kgs/Ha/Annum, Flower Yield 60 Kgs/Day. Avg., 75 Kgs Rose Oil/Annum, 25000 Ltrs. Ro
Plant and Machinery cost:
30.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
45.00%
Break Even Point (BEP):
43.00 %
TCI :
98.00 Lakhs
Cost of Project :
98.00Lakhs
Add To Inquiry Basket
A Business Plan For Sanitary Napkins
A Business Plan For Sanitary Napkins

A sanitary napkin, also kno... Read More

Capacity :
Sanitary Napkins 4,800 PKTS per day
Plant and Machinery cost:
26.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
67.00 %
TCI :
0.00 Lakhs
Cost of Project :
84.00Lakhs
Add To Inquiry Basket
Start Manufacturing Of Blood Collection Tubes (Vacutainer)
Start Manufacturing Of Blood Collection Tubes (Vacutainer)

Blood collection tubes, also known as Vacutainer, are essential tools used in the med... Read More

Capacity :
-
Plant and Machinery cost:
464.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
32.00%
Break Even Point (BEP):
53.00 %
TCI :
0.00 Lakhs
Cost of Project :
985.00Lakhs
Add To Inquiry Basket
Start Production Of Potato Flakes
Start Production Of Potato Flakes

Capacity :
Potato Flakes 2 MT Per Day
Plant and Machinery cost:
178.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
45.00 %
TCI :
0.00 Lakhs
Cost of Project :
563.00Lakhs
Add To Inquiry Basket
Setup Manufacturing Unit Of Bicycle Saddle & Pedals
Setup Manufacturing Unit Of Bicycle Saddle & Pedals

Bicycle saddles and pedals are two crucial components that di... Read More

Capacity :
Saddle 7,000 Unit Per Day Pedals 10,000 Unit Per Day
Plant and Machinery cost:
208.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
31.00%
Break Even Point (BEP):
54.00 %
TCI :
0.00 Lakhs
Cost of Project :
575.00Lakhs
Add To Inquiry Basket
Opportunity in Sodium Sulfide Flakes Business From Sulfur and Caustic Soda
Opportunity in Sodium Sulfide Flakes Business From Sulfur and Caustic Soda

Sodium Sulfide Flakes, scie... Read More

Capacity :
Sodium Sulfide Flakes 10,000 MT Per Annum
Plant and Machinery cost:
282.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
49.00 %
TCI :
0.00 Lakhs
Cost of Project :
1426.00Lakhs
Add To Inquiry Basket
Business Plan for Lithium Ion Battery (Battery Assembly)
Business Plan for Lithium Ion Battery (Battery Assembly)

A lithium ion battery (Battery Assembly) is a rechargeable battery that is typically ... Read More

Capacity :
-
Plant and Machinery cost:
172.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
61.00 %
TCI :
0.00 Lakhs
Cost of Project :
812.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business of Steel Containers (Cargo Containers)
Start Manufacturing Business of Steel Containers (Cargo Containers)


Read More

Capacity :
Cargo Containers (Size 20 Feet) 34 Nos Per Day
Plant and Machinery cost:
272.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
1992.00Lakhs
Add To Inquiry Basket
Start Cutting and Grinding Disc Business
Start Cutting and Grinding Disc Business

 

Cutting and grind... Read More

Capacity :
Cutting Disc Size: (115 mm x 1 mm) 2,000 Pcs Pr Day Grinding Disc (115 mm x 6 mm) 2,000 Pcs Pr Day
Plant and Machinery cost:
141.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
48.00 %
TCI :
0.00 Lakhs
Cost of Project :
423.00Lakhs
Add To Inquiry Basket
Mink Blankets Production
Mink Blankets Production

 

Mink blankets, de... Read More

Capacity :
-
Plant and Machinery cost:
2700.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
42.00 %
TCI :
0.00 Lakhs
Cost of Project :
6000.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Best Plan of Tennis Racke... 0 0.00 0.00
A Business Plan for Silic... 0 23.00 1288.00
Manufacturing Business Of... 0 34.00 324.00
Red Chilli Oleoresin Manu... Chilli Oleoresin 6,250 Kg Per Day 25.00 3250.00
Start a Business of Low R... Low Relaxation Pre-stressed Concrete 83.3 MT Per Day Steel Strand (LRPC) 25.00 5370.00
Moringa Leaf Powder Produ... Moringa Leaf Powder 1,000 Kg Per Day 29.00 189.00
Manufacturing Business Al... Aluminium Cans & Easy Open End (EOE) 40 Lakh Pcs. Per Day 26.00 72100.00
Production Business Of Me... MDPE Pipes 5,400 Kgs per day 27.00 376.00
Set Up Activated Carbon F... Activated Carbon 2,000 Kg Per Day 25.00 606.00
Manufacturing Business of... 0 0.00 0.00
Plant of Red Chili Oleore... 0 0.00 0.00
The Fuel of the Future Co... 0 0.00 0.00
Copper Powder Using Elec... 1,20,000 Kgs Per Annum 27.00 338.00
ISO Freight Containers 15,000 Nos. Per Annum 15,000 Nos. Per Annum 12.00 9658.00
Manufacturing Business of... 5,000 MT Per Annum 28.00 1287.00
Start a Business Of Ethyl... 30,000 MT Per Annum 28.00 7206.00
Manufacturing Plant of Co... 0 0.00 0.00
Setup Unit Of Tea Blendin... - 28.00 242.00
Start Manufacturing Busin... Blood Bags 10,000 Nos per day 30.00 1092.00
Start Production of Decor... Decorative Laminated Sheet (Sunmica) 5,000,000 Sq.Mt. Per Annum 63.00 2257.00
Copper Tube Fittings Manu... Copper Tube Fittings 600 MT Per Annum Copper Scrap 24 MT Per Annum 28.00 675.00
Setup Pharmaceutical Tabl... - 27.00 786.00
Start Industry with Serum... 0 0.00 0.00
A Business Plan For Bottl... - 28.00 1975.00
Start Production Of Graph... Graphite Powder 10 MT Per Day 26.00 1998.00
Start Manufacturing Busin... Cement Paper Bag 50 Kgs Size 1,250 Th.Nos. Per Day Cement Paper Bag 25 Kgs Size 1,250 Th.Nos. Per 35.00 22800.00
Setup Plant of Biodegrad... - 29.00 1427.00
Setup Unit Of Aluminium E... Aluminium Extruded Products 10 MT per day 26.00 901.00
Unlocking the Secrets: Ho... 0 0.00 0.00
Setup Plant of Analytical... - 25.00 646.00
12345678910...

Showing 541 - 600 of 726 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

And before diversifying/venturing into any product, wish to study the following aspects of the identified product:
  • Good Present/Future Demand
  • Export-Import Market Potential
  • Raw Material & Manpower Availability
  • Project Costs and Payback Period

We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

Reasons for buying the report:
  • This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.
  • This report provides vital information on the product like its definition, characteristics and segmentation.
  • This report helps you market and place the product correctly by identifying the target customer group of the product.
  • This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.
  • The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.
The report contains all the data which will help an entrepreneur find answers to questions like:
  • Why I should invest in this project?
  • What will drive the growth of the product?
  • What are the costs involved?
  • What will be the market potential?

The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product. The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.

  • Our research reports broadly cover Indian markets, present analysis, outlook and forecast.
  • The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players.
  • We use reliable sources of information and databases. And information from such sources is processed by us and included in the report.

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

Introduction
  • Project Introduction
  • Project Objective and Strategy
  • Concise History of the Product
  • Properties
  • BIS (Bureau of Indian Standards) Provision & Specification
  • Uses & Applications
Market Study and Assessment
  • Current Indian Market Scenario
  • Present Market Demand and Supply
  • Estimated Future Market Demand and Forecast
  • Statistics of Import & Export
  • Names & Addresses of Existing Units (Present Players)
  • Market Opportunity
Raw Material
  • List of Raw Materials
  • Properties of Raw Materials
  • Prescribed Quality of Raw Materials
  • List of Suppliers and Manufacturers
Personnel (Manpower) Requirements
  • Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel
Plant and Machinery
  • List of Plant & Machinery
  • Miscellaneous Items
  • Appliances & Equipments
  • Laboratory Equipments & Accessories
  • Electrification
  • Electric Load & Water
  • Maintenance Cost
  • Sources of Plant & Machinery (Suppliers and Manufacturers)
Manufacturing Process and Formulations
  • Detailed Process of Manufacture with Formulation
  • Packaging Required
  • Process Flow Sheet Diagram
Infrastructure and Utilities
  • Project Location
  • Requirement of Land Area
  • Rates of the Land
  • Built Up Area
  • Construction Schedule
  • Plant Layout and Requirement of Utilities
Assumptions for Profitability workings
Plant Economics
Production Schedule
Land & Building
  • Factory Land & Building
  • Site Development Expenses
Plant & Machinery
  • Indigenous Machineries
  • Other Machineries (Miscellaneous, Laboratory etc.)
Other Fixed Assets
  • Furniture & Fixtures
  • Pre-operative and Preliminary Expenses
  • Technical Knowhow
  • Provision of Contingencies
Working Capital Requirement Per Month
  • Raw Material
  • Packing Material
  • Lab & ETP Chemical Cost
  • Consumable Store
Overheads Required Per Month And Per Annum
  • Utilities & Overheads (Power, Water and Fuel Expenses etc.)
  • Royalty and Other Charges
  • Selling and Distribution Expenses
Salary and Wages
Turnover Per Annum
Share Capital
  • Equity Capital
  • Preference Share Capital
Annexure 1:: Cost of Project and Means of Finance
Annexure 2:: Profitability and Net Cash Accruals
  • Revenue/Income/Realisation
  • Expenses/Cost of Products/Services/Items
  • Gross Profit
  • Financial Charges
  • Total Cost of Sales
  • Net Profit After Taxes
  • Net Cash Accruals
Annexure 3 :: Assessment of Working Capital requirements
  • Current Assets
  • Gross Working. Capital
  • Current Liabilities
  • Net Working Capital
  • Working Note for Calculation of Work-in-process
Annexure 4 :: Sources and Disposition of Funds
Annexure 5 :: Projected Balance Sheets
  • ROI (Average of Fixed Assets)
  • RONW (Average of Share Capital)
  • ROI (Average of Total Assets)
Annexure 6 :: Profitability ratios
  • D.S.C.R
  • Earnings Per Share (EPS)
  • Debt Equity Ratio
Annexure 7 :: Break-Even Analysis
  • Variable Cost & Expenses
  • Semi-Var./Semi-Fixed Exp.
  • Profit Volume Ratio (PVR)
  • Fixed Expenses / Cost
  • B.E.P
Annexure 8 to 11:: Sensitivity Analysis-Price/Volume
  • Resultant N.P.B.T
  • Resultant D.S.C.R
  • Resultant PV Ratio
  • Resultant DER
  • Resultant ROI
  • Resultant BEP
Annexure 12 :: Shareholding Pattern and Stake Status
  • Equity Capital
  • Preference Share Capital
Annexure 13 :: Quantitative Details-Output/Sales/Stocks
  • Determined Capacity P.A of Products/Services
  • Achievable Efficiency/Yield % of Products/Services/Items
  • Net Usable Load/Capacity of Products/Services/Items
  • Expected Sales/ Revenue/ Income of Products/ Services/ Items
Annexure 14 :: Product wise domestic Sales Realisation
Annexure 15 :: Total Raw Material Cost
Annexure 16 :: Raw Material Cost per unit
Annexure 17 :: Total Lab & ETP Chemical Cost
Annexure 18 :: Consumables, Store etc.,
Annexure 19 :: Packing Material Cost
Annexure 20 :: Packing Material Cost Per Unit
Annexure 21 :: Employees Expenses
Annexure 22 :: Fuel Expenses
Annexure 23 :: Power/Electricity Expenses
Annexure 24 :: Royalty & Other Charges
Annexure 25 :: Repairs & Maintenance Exp.
Annexure 26 :: Other Mfg. Expenses
Annexure 27 :: Administration Expenses
Annexure 28 :: Selling Expenses
Annexure 29 :: Depreciation Charges – as per Books (Total)
Annexure 30 :: Depreciation Charges – as per Books (P & M)
Annexure 31 :: Depreciation Charges - As per IT Act WDV (Total)
Annexure 32 :: Depreciation Charges - As per IT Act WDV (P & M)
Annexure 33 :: Interest and Repayment - Term Loans
Annexure 34 :: Tax on Profits
Annexure 35 ::Projected Pay-Back Period And IRR